183_projects:problem9_fall2021_b

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
Next revisionBoth sides next revision
183_projects:problem9_fall2021_b [2022/03/15 14:23] pwirving183_projects:problem9_fall2021_b [2022/03/17 06:06] pwirving
Line 1: Line 1:
 <WRAP info> <WRAP info>
  
-==== Project 8: Learning issues ====+==== Project 9: Learning issues ====
  
   * Gravitational potential energy   * Gravitational potential energy
Line 26: Line 26:
  
 Carver needs you to plan the launch and any subsequent course corrections needed to get the satellite into a geosynchronous pole-to-pole orbit. Carver needs you to plan the launch and any subsequent course corrections needed to get the satellite into a geosynchronous pole-to-pole orbit.
 +
 +====== Project 9: Part B: Taiscéalaí cumarsáide a sheoladh ======
 +
 +Tá go leor airgid ag Carver sa tsatailít seo, mar sin tá sé ag iarraidh ar d'fhoireann fithis na satailíte a insamhail. Tá a phríomh-eolaí ríomhaireachta, Henry Gupta, imithe ar iarraidh, ach d’fhág sé píosa cód a thaispeánann fithis na satailíte (nó mar sin deir sé, nach eolaí i ndáiríre é Carver).
 +
 +Tá sé ag iarraidh ort a chinntiú go ndéanann insamhalta Gupta léiriú cruinn ar ghluaisne an chórais. Dá n-úsáidfí graif de ghluaiseacht an fhuinnimh sa chóras agus saighead a sheasann don veicteoir glanfhórsa chuirfí ina luí air i ndáiríre.
  
  
  • 183_projects/problem9_fall2021_b.txt
  • Last modified: 2022/03/17 14:28
  • by pwirving