183_projects

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
183_projects [2024/12/04 14:12] hallstein183_projects [2024/12/23 19:41] (current) hallstein
Line 19: Line 19:
 Weekly projects are listed below. Each new project will be released at the beginning of the week in which students will work on it. Part of your grade includes taking pictures of your white-boarded solution to each problem - each student is responsible for their own pictures. If the problem includes computation, you must also include screenshots of your working code. Pictures/screenshots are uploaded to Gradescope along with your weekly reflections. Weekly projects are listed below. Each new project will be released at the beginning of the week in which students will work on it. Part of your grade includes taking pictures of your white-boarded solution to each problem - each student is responsible for their own pictures. If the problem includes computation, you must also include screenshots of your working code. Pictures/screenshots are uploaded to Gradescope along with your weekly reflections.
  
 +/*
 ==== Fall Projects ==== ==== Fall Projects ====
 ** [[:183_projects:problem1_spring2024|Project 1A (F24) - River Crossing]]** ** [[:183_projects:problem1_spring2024|Project 1A (F24) - River Crossing]]**
Line 77: Line 77:
  
  
-/* 
  
-*/ 
- 
- 
-/* 
  
  
  • 183_projects.1733321563.txt.gz
  • Last modified: 2024/12/04 14:12
  • by hallstein