Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
184_projects:f20_project_5 [2020/10/02 22:20] – dmcpadden | 184_projects:f20_project_5 [2020/10/08 20:49] (current) – [Project 5A: Lightbulbs'R'Us and JPL] cookkai3 | ||
---|---|---|---|
Line 21: | Line 21: | ||
==== Project 5B: Artemis' | ==== Project 5B: Artemis' | ||
- | After you stabilized Johnny 5, team leader Melissa Lewis decides Artemis 13 needs to go home before anything else happens. Just as she gives the order to rotate boosters in order to send the ship home, the crew feels the spacecraft rock violently and warning lights start going off everywhere. The command ship starts to lose all of its power (maybe it had something to do with not being able to get the special tape from the STICKYSTUFF corporation at Lakeview). After a quick investigation, | + | In part thanks to your brilliant work with the lightbulbs and JPL, the Artemis 13 Spacecraft was able to have a successful launch. While on the way to the moon, disaster strikes. Among other things, the air filtration system seems to be malfunctioning. Team leader Melissa Lewis decides Artemis 13 needs to go home ASAP. Just as she gives the order to rotate boosters in order to send the ship home, the crew feels the spacecraft rock violently and warning lights start going off everywhere. The command ship starts to lose all of its power (maybe it had something to do with not being able to get the special tape from the STICKYSTUFF corporation at Lakeview). After a quick investigation, |
* Gauge Lights: RGL=100Ω | * Gauge Lights: RGL=100Ω | ||
* Navigation System: RNS=700Ω | * Navigation System: RNS=700Ω |