Differences
This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
| course_planning:183_projects:project_solution_template [2016/04/25 18:16] – pwirving | course_planning:183_projects:project_solution_template [2016/05/27 14:59] (current) – obsniukm | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | ~~NOTOC~~ | + | [[course_planning: |
| - | + | ||
| - | [[course_planning: | + | |
| <WRAP info> | <WRAP info> | ||
| Line 13: | Line 11: | ||
| </ | </ | ||
| - | ====== Project 1: Part 1: Aspen Extreme | + | ====== Project 1: Part X: Title ====== |
| - | + | ||
| - | Joe Bob runs a ski resort with the best ski hills in the area. The only thing he lacks is an awesome tubing hill with a tuber lodge at the top. Joe hires your group to design a hill with a mechanism to pull tubers from the back of the hill up to the top so people can slide down the other side and have lots of fun. | + | |
| - | + | ||
| - | Due to budget cuts, Joe Bob cannot produce enough snow to cover the entire hill. There is a 5 meter segment of dirt at the base of the hill. Keep in mind that in order to stay within safety regulations, | + | |
| ====== Project 1 Solution: Part X: Title ====== | ====== Project 1 Solution: Part X: Title ====== | ||
| Line 26: | Line 19: | ||
| * **Question: | * **Question: | ||
| * **Expected Answer: | * **Expected Answer: | ||
| - | |||
| - | * **Question: | ||
| - | |||
| - | * **Expected Answer: | ||
| - | |||
| - | * **Question: | ||
| - | |||
| - | * **Expected Answer: | ||
| - | $$t=d/v$$ | ||
| - | $$t=(h)sin(θ)/ | ||
| - | $$P = W_{motor}/t (watts)$$ | ||
| - | |||
| - | * **Question: | ||
| - | |||
| - | * **Expected Answer: | ||
| - | $$Work -> System: Tube$$ | ||
| - | $$Energy -> System: Earth+Tube+Motor$$ | ||
| - | |||
| </ | </ | ||