Differences
This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
course_planning:183_projects:project_solution_template [2016/04/25 18:16] – pwirving | course_planning:183_projects:project_solution_template [2016/05/27 14:59] (current) – obsniukm | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ~~NOTOC~~ | + | [[course_planning: |
- | + | ||
- | [[course_planning: | + | |
<WRAP info> | <WRAP info> | ||
Line 13: | Line 11: | ||
</ | </ | ||
- | ====== Project 1: Part 1: Aspen Extreme | + | ====== Project 1: Part X: Title ====== |
- | + | ||
- | Joe Bob runs a ski resort with the best ski hills in the area. The only thing he lacks is an awesome tubing hill with a tuber lodge at the top. Joe hires your group to design a hill with a mechanism to pull tubers from the back of the hill up to the top so people can slide down the other side and have lots of fun. | + | |
- | + | ||
- | Due to budget cuts, Joe Bob cannot produce enough snow to cover the entire hill. There is a 5 meter segment of dirt at the base of the hill. Keep in mind that in order to stay within safety regulations, | + | |
====== Project 1 Solution: Part X: Title ====== | ====== Project 1 Solution: Part X: Title ====== | ||
Line 26: | Line 19: | ||
* **Question: | * **Question: | ||
* **Expected Answer: | * **Expected Answer: | ||
- | |||
- | * **Question: | ||
- | |||
- | * **Expected Answer: | ||
- | |||
- | * **Question: | ||
- | |||
- | * **Expected Answer: | ||
- | t=d/v | ||
- | t=(h)sin(θ)/(v) | ||
- | P=Wmotor/t(watts) | ||
- | |||
- | * **Question: | ||
- | |||
- | * **Expected Answer: | ||
- | Work−>System:Tube | ||
- | Energy−>System:Earth+Tube+Motor | ||
- | |||
</ | </ | ||