Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
course_planning:184_projects:f17_project_5 [2017/10/03 16:41] – created caballero | course_planning:184_projects:f17_project_5 [2017/10/05 16:47] (current) – dmcpadden | ||
---|---|---|---|
Line 118: | Line 118: | ||
Evector=arrow(pos=rpoint, | Evector=arrow(pos=rpoint, | ||
</ | </ | ||
+ | |||
+ | === Project 6B: Maverick and JPL === | ||
+ | |||
+ | {{183_notes: | ||
+ | |||
+ | You are working for The Jet Propulsion Laboratory (JPL) Division of NASA testing a new and highly experimental spacecraft capable of in atmosphere flight as well as outer orbit maneuvering. Lieutenant Pete " | ||
+ | {{ 183_notes: | ||
+ | |||
+ | Maverick is convinced that the time between when the problem happens and when the warning light comes on is way too long, and this delay in relaying the warning to him could lead to a very problematic incident in the future. He does not want to loose another Goose. You have been given the task of explaining to Maverick why this could not be the case, and your boss, Clint Howard, has given you the following circuit diagram to try and aid you in your explanation to Maverick. | ||
+ | |||
+ | Maverick likes numbers, so part of your explanation should also include a calculation of the amount of time it takes the light to come on when the length of the wire in the circuit between the stabilizer control module switch and the warning light in the cockpit is 5.2m distance. He should also understand what the electric field looks like in this circuit, and why it means that his original presumptions about the warning light " |