course_planning:183_projects:s20_project_14

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
course_planning:183_projects:s20_project_14 [2020/04/16 16:24] pwirvingcourse_planning:183_projects:s20_project_14 [2020/04/16 16:25] (current) pwirving
Line 13: Line 13:
 [[:183_notes:learning goals:week 13|Learning Goals Week 14]]  [[:183_notes:learning goals:week 13|Learning Goals Week 14]] 
  
-====== Project 13: Part B: Showdown at boar tiger corral ======+====== Project 14: Part B: Showdown at boar tiger corral ======
  
 After the epic showdown, the leaders of the boar tiger defense team decide to commission the development of an arcade game simulating the battle.  The head of the development team, Boris Grishenko (Борис Грищенко), recently resigned.  He leaves for you a partially completed section of code which aims to show the paths that the cannonball and block trace out in time.  Pick up where he left off. After the epic showdown, the leaders of the boar tiger defense team decide to commission the development of an arcade game simulating the battle.  The head of the development team, Boris Grishenko (Борис Грищенко), recently resigned.  He leaves for you a partially completed section of code which aims to show the paths that the cannonball and block trace out in time.  Pick up where he left off.
  • course_planning/183_projects/s20_project_14.1587054289.txt.gz
  • Last modified: 2020/04/16 16:24
  • by pwirving