course_planning:183_projects:s20_week_7_problems

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

course_planning:183_projects:s20_week_7_problems [2020/07/30 02:15] – created pwirvingcourse_planning:183_projects:s20_week_7_problems [2021/03/01 20:50] (current) – [Scenario 7a: Captain America slows down a train] pwirving
Line 26: Line 26:
   *  Draw the energy bar charts for the scenario.   *  Draw the energy bar charts for the scenario.
  
-2. Pick a system to calculate how much work Captain America must do to slow the train+2. Pick a system to calculate how much force Captain America must apply to slow the train
 down in 750 m. down in 750 m.
  
  • course_planning/183_projects/s20_week_7_problems.txt
  • Last modified: 2021/03/01 20:50
  • by pwirving